|
|
| GBLX/Frontier |
| |
| |
Construction Manager for a complete build out of a 130,000 square foot switch
site in Manhattan. The project is the largest of the client’s
sites in the United States and incorporates all architectural and
MEP disciplines. As Construction Manager, PM was responsible for
helping to bring the project from the design and pre-construction
phase to final completion. As always, speed to market is critical
and PM was particularly suited to achieve this goal without missing
any critical steps along the way.
|
| |
Other Major Projects were completed for this client in the following cities:
Albany, Boston, Buffalo, Newark, Poughkeepsie,
Rochester, and Syracuse. |
| Time
Warner Telecom |
| Orange County, CA |
|
Design-Build of 15,000 square feet of telecom switching environment and 8,000
square feet of sales and administrative area. The critical component
of the work included site analysis, utility upgrades, diverse power
and fiber feeds, EPS/generator systems, UPS systems, and a DC power
and distribution plant. As Construction Manager, PM was charged
with assembling the entire team, including Engineers and Architects. |
| |
Other Major Switch and Collocation Projects for this client were completed
in the following cities: Albany, Aurora,
Binghamton, Cincinnati, Chicago, Columbus, Dayton, Denver, Jersey
City, Los Angeles, New York and Orlando. |
| Road
Runner |
| Austin, TX |
|
Design-Build of new Regional Data Center/Cable Head-End Facility complete with
diverse power and cable feeds, EPS/Generator systems, UPS power
and distribution, and sales office component. As Construction Manager,
PM was asked by the client to assemble the remainder of the team
including the Mission Critical design Engineers and the Architect
for the Project. |
| |
PM led the team for Regional Data Center construction
in the following cities: Austin,
Chelmsford, Columbus, Detroit, Kansas City, Oahu, Orlando, Syracuse,
and Tampa. |
| |
|